MEP ICT Consultancy

Co-ordination between ICT infrastructure and mechanical, electrical, plumbing (MEP) systems from RIBA Stage 2 through detailed design.

What We Deliver

RIBA Stage Support

ICT input from concept (Stage 2) through technical design (Stages 3–4), ensuring infrastructure is feasible and aligned with building strategy.

Co-ordination Drawings & Clash Detection

Identification of conflicts between ICT routes, MEP systems, and structural elements before construction starts.

Design Validation & Peer Review

Third-party assessment ensuring proposed infrastructure is technically sound, compliant, and buildable within budget and schedule.

Specification & Handover Documentation

Performance specifications, design packs, and clear installation guidance for contractors and ongoing facility management.


Topics & Guides

RIBA Stage Design Support

From concept through detailed design

Learn More

Co-ordination & Clash Detection

Avoiding mechanical/ICT conflicts

Learn More

Design Validation & Peer Review

Ensuring buildability and compliance

Learn More

Performance Specification Writing

Clear, measurable outcomes

Learn More

FAQs

Ideally at RIBA Stage 2 (Concept Design) to influence routing, power provision, and cooling planning before detailed design locks in.

A clash report identifies where ICT cable routes, racks, or equipment conflict with mechanical ducts, electrical runs, or plumbing. Early detection saves rework costs.

Yes. We support from concept through detailed design (RIBA 2–4) and are available during build-out for design queries or change justification.

Get ICT Consultancy into Your Project Early

Early involvement prevents costly rework and ensures a co-ordinated, buildable design.

Discuss Your Project