Predictive wireless and ICT infrastructure design, engineered for integration into MEP building services from RIBA Stage 2–5.
We use predictive RF modelling to design wireless infrastructure before installation, aligning coverage, capacity, and performance requirements with the building design.
By modelling wall attenuation, construction materials, and user density at design stage, we provide coordinated access point layouts, power requirements, and containment allowances that integrate directly with MEP services.
Visualising RF performance during design to support coordinated delivery.
Coordinating ICT infrastructure at early design stages reduces rework, improves performance, and ensures alignment with building services.
Identify clashes and performance risks early through coordinated RF modelling and ICT design.
Aligning ICT infrastructure with containment routes, risers, comms rooms, and mechanical systems within BIM environments.
Designing infrastructure in line with recognised structured cabling and wireless performance standards.