ICT Design for MEP Projects
Predictive wireless and ICT infrastructure design, engineered for integration into MEP building services from RIBA Stage 2–5.
Predictive Wireless Design
Ekahau-Based RF Planning
We use predictive RF modelling to design wireless infrastructure before installation, aligning coverage, capacity, and performance requirements with the building design.
By modelling wall attenuation, construction materials, and user density at design stage, we provide coordinated access point layouts, power requirements, and containment allowances that integrate directly with MEP services.
- RF propagation modelling based on building materials
- Capacity-led wireless planning
- Interference and channel planning analysis
Wireless Digital Modelling
Visualising RF performance during design to support coordinated delivery.
Why Early ICT Design Matters
Coordinating ICT infrastructure at early design stages reduces rework, improves performance, and ensures alignment with building services.
Risk Reduction
Identify clashes and performance risks early through coordinated RF modelling and ICT design.
MEP Coordination
Aligning ICT infrastructure with containment routes, risers, comms rooms, and mechanical systems within BIM environments.
Standards Compliance
Designing infrastructure in line with recognised structured cabling and wireless performance standards.
Supporting Lens Projects
ICT design and MEP coordination for commercial and infrastructure projects across Lens.